top of page
Project Summary
During my time at Aurecon, I was involved in many diverse projects. These projects are as follows below:
Brisbane Airport Arc Flash Mitigation
Supernode Stage 2 DC Arc Flash
Energex Protection Coordination of 11kV Feeders
UQ Dutton Park Load Analysis
Lockyer Energy Low Frequency Induction Study
Wyaralong Transformer Energisation Study
Supernode Stage 3 Arc Flash
Moranbah North Earth Mat Design
Energy Queensland Earth Mat Testing
Backed by industry
A big thank you to our Members for their ongoing support

bottom of page

